WP7

Work Package 7 (WP7): Re-design and QM manufacturing

Participants: ARQ (coordinator) plus ECE, AVS, STI, SSTL.

Objectives of WP7

  • To design the REACT QM considering the results obtained during the functional tests, tribology recommendations and SMA material characterization results.
  • To manufacture the Qualification Models for each application considered.
  • To prepare de Qualification Test Plan.

Description of work and tasks of WP7

Task 7.1 REACT QM Re-Design [ARQ]

Final design of QM will be addressed in this task. As commented previously it will be done using the very valuable data obtained in previous steps of the project as depicted in Figure:

wp7

Task 7.2 REACT QM Manufacturing [ARQ]

A total of 16 QM are foreseen to be manufactured and integrated under the scope of this task.

Task 7.3 REACT Qualification Campaign definition [AVS,ARQ, ECE, SSTL, STI]

REACT QM qualification test plan definition [ARQ]. REACT QM within launcher structures qualification test plan definition [ECE]. REACT QM within planetary exploration subsystems qualification test plan definition [AVS]. REACT QM within big structures deployment qualification test plan definition [STI]. REACT QM within small satellites subsystems deployment qualification test plan definition [SSTL].

Task 7.4 Design and manufacture QM test bench for launcher structures [ECE]

Tensioning tooling (937 S/C representative rings) are used for tensioning activities as well as for vibration and thermal tests.

Task 7.5 Design and manufacture QM test bench for planetary exploration subsystems [AVS]

Design and manufacture test bench required for functional testing and qualification testing of the REACT devices within planetary exploration subsystems.

Task 7.6 Design and manufacture QM test bench for big structures deployment [STI]

Related with the QM test bench design and manufacturing the next engineering branches and tasks should be performed: Mechanical Engineering, Electrical Engineering, General MAIT.

Task 7.7 Design and manufacture QM test bench for small satellites subsystems deployment[SSTL]

Design and manufacture test bench required for functional testing and qualification testing of the REACT devices within small satellites subsystems deployment.